SheFix

Hiring & Planning · Homeowner Project Records

A Home Project Record: Compare Quotes, Approve Changes, and Close Out the Job

Keep the agreed scope, quote comparison, written change approvals, and warranty details together from the first estimate through the final walkthrough.

DifficultyHomeowner planningTime20–30 minutes to set up a project recordMaterialsNo materials required
A woman contractor and homeowner review the written scope, a change approval, and a completion checklist together.
A woman contractor and homeowner review the written scope, a change approval, and a completion checklist together.

A project record makes it easier to see what was agreed, what changed, and what is still unfinished. Keep one set of notes for the whole job, even if you receive several estimates or communicate in more than one place.

Compare quotes on the same work

Give each professional the same project brief, photos, measurements, and timing needs. Record the amount, date, and scope version for each estimate. Compare the work line by line instead of ranking only the bottom-line price.

For every quote, capture:

  • Business name and the person who prepared it.
  • Diagnosis or assessment, if the project requires one.
  • Labor, materials, equipment, and preparation.
  • Removal, disposal, cleanup, permits, and inspection assumptions.
  • Allowances, exclusions, warranty, payment schedule, and start window.
  • What could change the price and how the change will be approved.

Add trade-specific questions before comparing:

  • **Plumbing:** Are shutoffs, access, removal, reconnection, leak checks, and surface repair included?
  • **Electrical:** Are load checks, circuit or panel work, permits, labeling, and final testing included?
  • **HVAC:** Does the scope identify the diagnosis, equipment, installation, duct or control changes, startup testing, and removal?
  • **Roofing:** Are tear-off, underlayment, flashing, ventilation, cleanup, and hidden-decking conditions addressed?
  • **Remodeling:** Are demolition, protection, disposal, finish selections, subcontractors, and restoration identified?

Write the agreed scope in one place

Before work starts, save the accepted estimate and confirm the exact areas, materials, finish, schedule, site access, cleanup, and payment milestones. Write down who is expected to arrive and whether subcontractors are involved. Ask who will handle permits or inspections when they apply.

Do not rely on a text such as “we will take care of it” for work that changes cost, timing, or the finished result. Ask the professional to update the scope or attach a written clarification.

Approve changes before they happen

Use this change note for each added or revised item:

  • Project and date:
  • Original scope item:
  • Proposed change and reason:
  • Added or reduced amount:
  • Schedule effect:
  • Materials, finish, or warranty effect:
  • Who will perform the changed work:
  • Homeowner decision: approve / decline / ask for clarification:
  • Homeowner name and approval date:
  • Professional confirmation and date:

Keep the original estimate. A new version should show what changed, not erase the earlier agreement. If the price or schedule is unclear, do not treat silence as approval.

Close out the work

At the final walkthrough, compare the result with the agreed scope. Photograph completed areas and list anything unfinished or needing correction. Confirm how and when the remaining work will be addressed before treating the job as complete.

Save the final invoice, proof of payment, permits or inspection records where applicable, product names and model numbers, warranty documents, care instructions, and the professional's contact details. Note the date the work was completed and any follow-up deadline.

Keep the record accessible

SheFix's free homeowner workspace can keep project documents and messages together. You can also use your own folder or paper file. The important part is being able to find the accepted scope, later approvals, payment record, and closeout details without relying on memory.

Your printable project checklist

Use your browser's PDF option to keep a copy. Create a free account to keep project records and compare professionals.

Sources & further reading

Check that each source applies to your project and confirm current local requirements.

Keep building your home skills